Start with the service outcome
A feasibility study is clearer when the required outcome is defined before a route is discussed. Identify who needs to connect, the applications that matter, expected growth and any availability or resilience requirements.
Describe the places to connect
Provide site names, street addresses or coordinates, property contacts, access limitations and any known existing ducts, poles, equipment rooms or network assets.
- Sites and approximate distances
- Expected users and traffic
- Target activation date
- Known access or security constraints
What happens next
The desktop assessment identifies likely data gaps and route options. A field survey then verifies constructability, existing services, permissions, access and the assumptions needed for a budget and programme.
Use the guide as a starting point.
Every route, organisation and regulatory environment is different. Share the location and project objective with African Dream for a more specific discussion.